mkizer posted on August 06, 2009 16:23

Just added Photos...
- Drywall taped and mudded.
- Cement board taped and mortared.
- Cement board water sealed.
- Walls and ceiling textured.
- Walls and ceiling covered in two coats of primer.
Painting already took place (photos to come)... time to tackle cement board on the floor and get the tile install going!